安规网 » 澳洲产品认证 » AS/NZS 3120中Current breaking test疑惑
本页主题: AS/NZS 3120中Current breaking test疑惑 打印 | 加为IE收藏 | 收藏主题 | 上一主题 | 下一主题

gdt102


级别: 安规学徒
精华: 0
发帖: 318
安规威望: 99 点
安规金币: 34 个
安规宣传: 0 次
安规测试报告: 0 份
在线时间:785(小时)
注册时间:2007-08-20
最后登录:2011-12-31

AS/NZS 3120中Current breaking test疑惑

AS/NZS 3120中Current breaking test要求不甚明白:
...
(a) A plug shall be inserted in the socket with no current flowing.
(b) Immediately following each full insertion, a current as prescribed in Items (i) and
(ii) shall be passed through a circuit including the plug and socket for 15 s.
(c) The plug shall be then withdrawn from the socket under load at a rate of
approximately 150 mm/s, and shall remain withdrawn for approximately 105 s.
...

以上是说插头插入插座时要求不通电流,插入后立即通电维持15S, 之后插头拔出插座,拔离插座的状态维持105S; 然后继续开始第二个循环吗?那有这样的插拔设备可以做到这个吗?一般我知道是直接机械插拔或者带电插拔,这个要求好像有点复杂,我也不明白标准这么要求是基于什么考虑?

另外,以下这句话是不是表示,如果产品带接地,要求接地也通电流!Where an earthing contact and an earthing pin are included, the earthing terminal of the socket shall be connected to the neutral terminal during the test.

期待高手解答,谢谢先La!

本文由gdt102在供参考的旧版安规网发表,建议进入新版交流!
x幸福就像气球一样,每隔一段时间需要持续补吹。
顶端 Posted: 2011-01-17 11:32 | [楼 主]    新版 | 旧版安规网
安规网 » 澳洲产品认证


安规网免责声明
安规网已运行
安规网所有的原创文章,版权归安规网和作者共同拥有,未经许可,任何网站不得非法盗链、转载及抄袭!
网友文章或评论仅代表作者个人观点并由其承担相应法律责任,不代表本站观点!如果侵犯了您的权益,请提供相关证明,我们将尽快删除!
安规网为非经营性技术论坛,所有资源均为网友自主提供,仅供个人学习与研究,版权归原作者,切勿用于商业用途,否则一切后果与安规网无关!

关于我们 | 认证工具 | 免责声明 | 法律条款 | 广告服务
Total 0.012150(s) query 4, Time now is:05-05 19:36, Gzip enabled
Powered by Angui.org Support by PHPWind

安规网版权所有 安规网 安规网论坛 安规认证论坛 Copyright Reserved
粤ICP备07035324号